Skip to content

Beta · Data may be lost.Your data may be reset or lost.

GateBrew
← GATE CSE 2015 Set 3
Questions

Q11

NAT1 markMedium

Consider a software program that is artificially seeded with 100 faults. While testing this program, 159 faults are detected, out of which 75 faults are from those artificially seeded faults. Assuming that both real and seeded faults are of same nature and have same distribution, the estimated number of undetected real faults is _______.

Sign in to save attempts.

The solution is hidden while you attempt this question. It opens once you check or show the answer.